Electricians In Crawley

This week we wired up another endless pool, fitted emergency lighting inside a Bakers Timber Building.

We also replaced 4 storage heaters at one property, cleaned up and removed all rubbish and old heaters.

Done some more work at the project in Crowborough. Got two bathrooms ready for the plasterers, supply put in for heated towel rails and under floor heating. Prep work for LED lighting and extractor fans was also done.

We also had a call out for a local manufacturing firm whose temperature control on a heater hopper had failed. The fault was investigated and a new controller and transformer was fitted.

A new socket was fitted in an office of a local firm. This was carried out out of hours, which involved the lifting of a suspended floor and connecting to an under floor busbar trunking.

IMG_1651IMG_1646IMG_1650